Mining giant BHP goes on trial in London over 2015 toxic Brazil disaster

Mining giant BHP goes on trial in London over 2015 toxic Brazil disaster

Aerial view of the city destroyed by floods following the collapse of the Fundão dam in Bento Rodrigues village, Minas Gerais state, Brazil, on October 14, 2024. – Emanuele Vitoria was at home with her father and brother when a river of mud bore down on their quiet village in the mountains of southeast Brazil nine years ago. The body of the five-year-old was found five days after the November 5, 2015 mudslide, triggered by the collapse of a dam at a mine owned by Samarco, a joint venture between Brazil’s Vale and Australian mining giant BHP. (Photo by DOUGLAS MAGNO / Agence France-Presse)

Australian mining giant BHP goes on trial on Monday over one of Brazil’s worst environmental disasters, potentially triggering billions of dollars in compensation to be shared among hundreds of thousands of plaintiffs.

The High Court in London will examine over several months whether BHP was partly liable for the 2015 collapse of a dam at a mining waste site in Brazil.

The rupture killed 19 people and unleashed a deluge of thick toxic mud into villages, fields, rainforest, rivers, and the ocean.

The Fundao tailings dam at an iron ore mine in the mountains of Minas Gerais state was managed by Samarco, co-owned by BHP and Brazilian miner Vale.

At the time of the disaster, BHP had global headquarters in the United Kingdom as well as in Australia.

A separate case in Brazil has seen Vale and BHP offer to pay almost $30 billion in compensation.

Vale has offered to share any compensation BHP ends up paying as a result of the London trial.

Tom Goodhead, of law firm Pogust Goodhead which brought the case, told a news conference last week that the London trial was the culmination of a six-year UK legal battle.

“(There) has been a systemic failure to adequately compensate victims or to provide adequate reparation in relation to the environmental harms. And that was why this case was launched,” he told reporters.

READ: Mining disasters: Enough is enough

The tragedy in the town of Mariana unleashed a torrent of almost 45 million cubic meters of highly toxic mining waste sludge, flooding 39 towns and leaving more than 600 people homeless.

The flood killed thousands of animals and devastated protected areas of tropical rainforest.

Mining disaster: ‘Unpunished’

The amount of damages sought in the upcoming civil trial is estimated at a total £36 billion ($47 billion), on behalf of more than 620,000 plaintiffs, including 46 Brazilian municipalities, companies, and indigenous peoples.

“We felt as if our whole world had collapsed,” Pamela Rayane Fernandes, whose five-year old daughter Emanuele Vitoria was killed in a mudslide, told Agence France-Presse ahead of Monday’s trial.

“Such a thing cannot go unpunished,” the 30-year-old added.

Aerial view of the remains of Mauro Marcos da Silva father’s house destroyed by floods following the collapse of the Fundão dam in Bento Rodrigues, Minas Gerais state, Brazil, on October 14, 2024. – Emanuele Vitoria was at home with her father and brother when a river of mud bore down on their quiet village in the mountains of southeast Brazil nine years ago. The body of the five-year-old was found five days after the November 5, 2015 mudslide, triggered by the collapse of a dam at a mine owned by Samarco, a joint venture between Brazilian mining giant Vale and Australia’s BHP. (Photo by DOUGLAS MAGNO / Agence France-Presse)

The hearing, set to last until early March 2025, must determine BHP’s potential liability surrounding the disaster.

If it is found to be liable, another UK trial should take place from October 2026 to determine the amount of damages.

BHP has said the London court case is unnecessary because of ongoing legal procedures in Brazil.

The company estimated that more than 200,000 plaintiffs in the London case had already been compensated.

BHP added that the Renova Foundation, which manages the compensation and rehabilitation programs, has already paid out more than $7.8 billion in emergency financial aid.

READ: BHP-Vale Brazil mine pays $260 mn for mudslide damage

The Australian mining giant said the quality of river water contaminated by the fallout has returned to pre-disaster levels.

However, a scientific paper published this year in the Franco-Brazilian geography review Confins said the dam rupture had caused “permanent effects of pollution” on the river Doce and its coastal plain.

The trial opens as BHP weighs whether to mount a renewed bid for British rival Anglo American after the latter rejected a $49 billion takeover in May.

BHP is allowed to come back with a fresh offer on November 29 following a six-month break, according to UK takeover rules.

In 2019, another tailings dam owned by Vale collapsed in Minas Gerais, killing 270 people and devastating the surrounding environment.

Read more...