Pilipinas Shell secures P9-B loan from BPI, Metrobank | Inquirer Business

Pilipinas Shell secures P9-B loan from BPI, Metrobank

By: - Reporter / @MegINQ
/ 12:33 PM March 02, 2023

MANILA, Philippines  -Pilipinas Shell Petroleum Corp. (PSPC) has secured a P9-billion loan from Bank of the Philippine Islands (BPI) and Metropolitan Bank and Trust Co (Metrobank).

In a disclosure to the Philippine Stock Exchange, Shell said the five-year loan would be split evenly between the two local banks and that it would reduce the oil firm’s “short-term volatilities in the market as it benefits from the low interest rate for its cash requirements.”

ADVERTISEMENT

Shell added that it would also renew an existing five-year loan with BPI that will mature on March 8.

Earlier this year, PSPC signed a tripartite agreement with Shell Energy Philippines Inc. and the Department of Energy (DOE) to conduct a pilot study of electric vehicle charging stations supplied by renewable energy.

FEATURED STORIES

The oil firm aims to supply sufficient renewable energy for the planet for more than 50 million homes, operate 2.5 million charging points for EVs, and produce eight times more low-carbon fuels.

Aside from its renewable energy commitments, Shell also invested in import facilities across the Philippines.

PSPC in 2022 broke ground for its third-largest import facility in Darong, Southern Mindanao to help provide an undisrupted supply of energy in the region.

It is expected to be fully operational by the third quarter of 2024, and has a rated capacity of 67 million liters of petroleum products. With this new project, PSPC had said it was eyeing 80 new mobility sites in Southern Mindanao by 2025.

Shell’s other import facilities include the Shell Import Facility Tabangao (SHIFT) in Batangas with a 263-million-liter capacity, the North Mindanao Import Facility in Cagayan de Oro City with a 90-million-liter capacity, and the Subic Import Terminal with a 54-million-liter capacity.

Shell currently has more than 1,100 stations nationwide and plans to expand its network by 40 to 60 service stations annually until 2025.

READ:

Gov’t, Shell studying viability of EV charging stations

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our daily newsletter

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.

Read Next
Don't miss out on the latest news and information. facebook follow

Subscribe to INQUIRER PLUS to get access to The Philippine Daily Inquirer & other 70+ titles, share up to 5 gadgets, listen to the news, download as early as 4am & share articles on social media. Call 896 6000.

TAGS: BPI, Loans, Metrobank, Pilipinas Shell
For feedback, complaints, or inquiries, contact us.
Your subscription could not be saved. Please try again.
Your subscription has been successful.

Curated business news

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.



© Copyright 1997-2023 INQUIRER.net | All Rights Reserved

We use cookies to ensure you get the best experience on our website. By continuing, you are agreeing to our use of cookies. To find out more, please click this link.