First Gen sets aside $2B for projects

A+
A
A-

First Gen Corp. of the Lopez group has set aside close to $2 billion (roughly P82 billion) to put up natural gas and hydropower projects over the next five years, in anticipation of the country’s need for additional capacities.

 

In an interview, First Gen president Francis Giles Puno said that of the planned capital spending, $1.5 billion (about P61 billion) would be used for the proposed San Gabriel natural gas power project in Batangas, which was estimated to generate 1,450 megawatts within a five-year period. Another $400 million (about P16.4 billion) would go to various hydropower projects now in the pipeline.

 

“We will be mobilizing for the San Gabriel power and run-of-river hydro generating plants this year,” Puno told the Inquirer.

 

For 2013 alone, First Gen has allocated up to $250 million (P10.25 billion) for capital spending, specifically for the gas and hydropower projects, according to Puno.

 

He earlier told the Inquirer that the proposed San Gabriel natural gas power project would be put up on the same site as its two gas facilities—the 1,000-MW Sta. Rita and 500-MW San Lorenzo gas plants.—Amy R. Remo

Disclaimer: The comments uploaded on this site do not necessarily represent or reflect the views of management and owner of INQUIRER.net. We reserve the right to exclude comments that we deem to be inconsistent with our editorial standards.

To subscribe to the Philippine Daily Inquirer newspaper in the Philippines, call +63 2 896-6000 for Metro Manila and Metro Cebu or email your subscription request here.

Factual errors? Contact the Philippine Daily Inquirer's day desk. Believe this article violates journalistic ethics? Contact the Inquirer's Reader's Advocate. Or write The Readers' Advocate:

c/o Philippine Daily Inquirer Chino Roces Avenue corner Yague and Mascardo Streets, Makati City,Metro Manila, Philippines Or fax nos. +63 2 8974793 to 94